DAILY WBS WISE PROGRESS REPORT

Doc. No.:

DEL/4664/AA

Date:

26-11-2014

Rev. No.:

0.0

Page No.:

1 OF 3

K-Electric CLIENT CONTRACTOR Descon Engineering Limited PROJECT

STGTPS Expansion II

REPORT NO. DATA DATE WEATHER

SAFETY: Description OSHA Recordable Lost Time Injuries First Aid Cases Nearmiss/Incidents Cases WORK LOST DUE TO RAIN MANPOWER TODAY Summary Total Nos. Comments:EQUIPMENT & PLANTS STATUS Summary Total Nos. Remarks:-

20141214 16-Dec-14 29° C, Dry/Warm

Last Week NA 0 0 0

Cumulative (To date) NA 0 0 0

Last Week

Cummulative(To date)

Direct 35

Indirect 23

Grand Total 58

Total Deployed 8

In Working Conditions 4

Break Down/Idle 4 Idle

TEST & RESULTS NA

PROGRESS MONITORING/CONTROL (CONSTRUCTION) - TODAY GRID PROGRESS WBS - L-III

Renovation of Existing battery room for 220vdc Battery Bank

290 A

WBS - L-III

Activity ID

Progress Status (On going subactivity

Activity Name

Activity ID

Ventilation fan holes finishing work completed.Roof & walls claning is in progress.

Battery Room

Physical % Completion (sub activity)

Remarks

38%

GENERATION PROGRESS

General Civil Works

General Civil Works

General Civil Works

A6360

A6260

A6431

Progress Status (On going subactivity

Activity Name

Excavation of boiler foundations at south side is in progress. Hard Barricading at north side for boiler foundations is in progress. Demolition work of boiler foundations at north side has started. Lifting & shifting of demolited debris for foundations # 5,4,3,2 is in progress.

Boiler Civil Works

Foundation of Turbine & Turbine Hall

Bore well development and storage tank

Physical % Completion (sub activity)

Remarks

67%

8%

60%

Gas cutting of old steel rebars at Old GT foundation # 5,4,3,2 is in progress.

75%

Demolition of old GT Foundation #01 is in progress.

18%

Deep Well Bore Drilling (first Stage 8" Dia) is in progress.

854 Ft

Deep Well Bore Drilling (2nd Stage 12" Dia) is in progress.

470 Ft

Deep Well Bore Drilling (3rd Stage 15" Dia) is in progress.

168 Ft

Drilling activity stop because pump outer casing plate damaged.(For repairing work hard barrication ,repairing material ,tools & tackle reached at site )

PROGRESS MONITORING/CONTROL (CONSTRUCTION) - TOMORROW GRID PROGRESS WBS - L-III Renovation of Existing battery room for 220vdc Battery Bank Dismantling & Installation of overhead crane

290 A

Progress Status (On going subactivity

Activity Name

Activity ID

Battery Room

Battery Room Renovation work will be continued.

GIS Hall

A meeting will be held b/w KE,DESCON & ALSTOM representatives regarding

288 & 311

Physical % Completion (sub activity)

Remarks

Physical % Completion (sub activity)

Remarks

dismantling & installation method.

GENERATION PROGRESS WBS - L-III

Activity ID

Activity Name

Progress Status (On going subactivity)

General Civil Works

A6360

Boiler Civil Works

Demolition/Excavation of boiler foundations at south side will resume. Hard barricading at north side will resume. Demolition of floor for boiler foundations at north side will resume.

General Civil Works

A6260

Foundation of Turbine & Turbine Hall

Lifting and shifting of debris will reume. Gas cutting of steel rebars will resume. Demolition of Old GT foundations will resume

General Civil Works

A6431

Bore well development and storage tank

Damaged Pump Repairing work will resume.

MISC. WORKS 1: DEL management toilet work is in progress almost 83 % completed. 2: Power cable & conduit installation from south Boilers site to north Boilers site is in progress (65% Completed) Bottlenecks Approved construction drawings for boiler foundations are not received at site. Approved civil drawings of STG and ACC are not yet received at site.

Daily Progress

MANPOWER STATUS PROJECT STGTPS Expansion II Sr. No. Craft Indirect / Management (Generation + Grid)

Total On roll

Absent

Doc. No.:

DEL/4664/AB

Date:

16-Dec-14

Rev. No.:

0.0

Page No.:

2 OF 3

Leave

Total Present

1

Site Manager

1

1

2

Project Lead

2

2

3

Planning Engineer

2

2

4

QA/QC Engineer

1

1

6

HSE Engineer

1

1

7

HSE Inspector

5

5

8

Admin Asistant

1

1

9

Area Engineer

5

5

10

Coordinator

1

1

11

Store Keeper

2

2

12

Surveyor

2

2

13

Visitors

Total (Indirect)

0

23

0

0

23

Direct (Generation + Grid) 1

Supervisor

2

Foreman

0

3

Mason

0

4

Driver

0

5

Scaffolder

3

3

6

Technician

1

1

7

Electrician

1

1

8

Fitter

1

1

9

Operator

5

5

10

Labor

21

21

11

Plumber

Total (Direct) Total (Indirect+Direct)

3

3

0

35

0

0

35

58

0

0

58

Manpower Strength

EQUIPMENT & PLANT STATUS

Doc. No.:

DEL/4664/AC

Date:

16-Dec-14

Rev. No.:

0.0

Page No.:

3 OF 3

K-Electric STGTPS Expansion II

CLIENT PROJECT Sr. No.

Equipment Description

1

Rig for Bore Well

2

Electric hilti

3

Jack Hammer Machine/Excavator

4

Gas Cutter Set

Total Deployed

In Working Conditions

Remarks

1

Breakdown

4

2

2

Idle

2

1

1

Idle

1

1

0

Idle

8

4

4

1

Total

Break Down/Idle

Equipment and Plant Status