Luis Alfonso Flores
Electronic Engineer
Date of brith 29-03-76 Acámbaro 1246, Col. Guanajuato Saltillo, México Tel: (844) 869 2085 Email:
[email protected]
I have a great professional experience at the technical level, the past six years have served as Superintendent of production and maintenance, where I have taken the opportunity to learn and apply various techniques and management tools in this field, as well as in the area of management, human resource management, projects and costs.
STUDIES Año 1998
Saltillo - México
Electronic Engineer specializing in digital processes Technological Institute of Saltillo
Languages:
Writen and Spoken
WORK EXPERIENCE May 2015 to date Sicitech
Superintendent Manager Operation Development Superintendent of date North Zone Manager Operation Development Department Engineering business area manager responsible for the operation.
2008 a 2015
Superintendent of production Compliance with the key performance indicators of the Department of safety, quality, cost, efficiencies, savings, EMC.
2004 a 2008
Superintendent of maintenance Implementation of the key performance indicators of the Department of safety, quality, costs, lost time
2003 a 2004
Electronic maintenance engineer
2002 a 2003
Electronic production engineer Modulo B
2001 a 2002
Compliance and implementation of the maintenance program, leading teams of problem solving, planning and implementation of improvement projects continues. Responsible for the administration of electric time, leading teams of troubleshooting, planning, development and implementation of improvement projects and responsible for the decline
Project Engeneer Responsible for the design validation of boards and starter projects for the area of children's products (diapers).
Sep. 1998. - Dic 2000
Fustery, Area Pharmaceutica Maintenance supervaisor
Work References Enrique Torrero Kimberly Clark de Mexico Gerente Administrativo Teléfono: 844 4193424 E-mail:
[email protected]
Corrective maintenance, preventative maintenance services and parts manufacturing.Corrective maintenance, preventative maintenance services and parts manufacturing.
Homero Ortiz Kimberly Clark de Mexico Gerente de Mantenimiento Teléfono: 1812941 E-mail:
[email protected]
David Orozco Danielli jefe de proyectos Teléfono: 844 8698847 E-mail:
[email protected]
ADDITIONAL TRAINING AND INTERESTS 1. Knowledge of operation, operation, diagnosis and troubleshooting control devices Sensores Transductores Plc (siemens, AB, ormec, Elau, Modicon, Quantum, Schneider) Drives 1305, 1335, 1395, powerflex 40/70/700, Micromaster, ABB ACS800, Reliance, Schneider,Abb, siemens, yaskawa 2.
Servo drives (kinetix, Simodrive, Sinamics, Eudrodriove, Controltechnique, Eco drive, DKC, DKR, ultra5000) Encoders, Resolver Vision sistem (cognex, DVT, insaight) Axis control (robox, ormec, siemens, AB, Elau) Comunication: Modbus, Profbus, Devicenet, Controlnet, ASI, Canopen, Ethernet
Manufacturing design commissioning of new projects and platform Change management (mechanical, control and electrical). a. Replacement of electronic platform to bags cassoli insuper5 b. Replacement of hayssen ultra flow control system c. Senning controller replacement d. Bretting controller replacement e. HMI to rewinder PCMC controller replacement f. Replacement of pneumatic tension control by load cells system g. Installation and commissioning of production lines h. Configuration, valance and conveyor intslaciones i. Design and manufacture of sorter j. Validation analysis of proyects k. Project collision sensors daimler
A. Changed the logic of a PLC 5 to a compactlogix and system of temperature control of JAWS and pyrometer redesign for JAWS to ropex, tire of the step by step system and pusher changed servos kinetix. B. The control system were with bam discontinued and unsupported operational description is generated and the program for plc contrologix changed obsolete servomotors by 15 axes kinetix developed operating and maintenance manual C. Replaced Board and HMI withdraws obsolete plc by logx5000 and polyethylene feeder installed servo kinetix the unwinding motor E.Replaced obsolete servodrives two separator bretting and formed by servo drive ultra 5000 replaced modicom processor for quantum supported modicom outputs. E: engineering design and replacement to remove obsolete screen, removed the crossreference between HMI and G & L pcmc F. The control system of power operated with hydraulic system with conical pulleys is replaced with electronic load cells and drives Comisioning installations and ECO and PCO: project excel to diaper machines Festo of inexpensive servos are installed to increase frequency of operation of bagger the ECO and PCO 5 machines Hayssen Servos are removed and is changed by new technology it easier and reduces the wiring considerably ECO and PCO 2 senning Servos are removed, PLC and is changed by new technology it easier and reduces the wiring considerably ECO and PCO 3 bretting 3 napkin rings of Raleigh, Alabama is uninstalled and reinstalled on the ground changing control systems design and replacement J.Cost analysis and validation of investment projects K. Motor vehicle crash anti online system board assembly operation Ramos Arizpe